Products Unit Heaters UDBP

Media

UDBP
UDBP
UDBP
UDBP
UDBP
burner flame
single orifice


Description

Reznor's V3 Series UDBP gas-fired unit heaters are available in 14 sizes ranging from 30,000 to 400,000 BTUH gas input.  Model UDBP heaters are designed for 82-83% thermal efficiency and are approved for commercial/industrial installations in the United States and Canada by the Canadian Standards Association (CSA).

 

Heating Range ( MBH )

Airflow Range ( CFM )

Throw Range ( Feet )

Heating Efficiency ( Gross )

Standard Features

  • Certified for commercial/industrial heating applications
  • 82-83% thermal efficient ~ TOP in its class!
  • 45-75 deg F rise range - sizes 30-350 (50-80 deg F rise range - size 400)
  • NEW TCORE2  design titanium stabilized aluminized steel heat exchanger (patent pending)
  • NEW TCORE2  design single burner combustion system including a one-piece burner assembly (patent pending)
  • 115/1/60 supply voltage
  • 115 volt open dripproof blower motor with internal overload protection - sizes 30-125
  • 115 volt open dripproof blower motor with internal overloads and definite purpose motor contactor - sizes 150-400
  • Direct drive blower with multispeed taps - sizes 30-125
  • Adjustable belt drive blower - sizes 150-400
  • Transformer for 24-volt controls
  • Integrated circuit board with diagnostic indicator lights
  • Blower relay (included on the circuit board)
  • Multi-try direct spark ignition with 100% lockout
  • Natural or propane single-stage gas valve (field adjustable for operation to 6,000 ft elevation)
  • Vibration/noise isolated venter motors ~ designed for low noise operation
  • 4-pt suspension
  • External terminal strip for 24-volt wiring
  • External gas connection
  • Improved cabinet design with less visible hardware and a NEW Reznor appearance

Optional Features - Factory Installed

  • Equipped for propane gas
  • Two-stage (70% low fire) natural or propane gas valve
  • 409 or 316 stainless steel heat exchangers
  • 208 and 230 single phase voltage; 208, 230, 480 and 575 three phase voltage - sizes 150-400
  • Adjustable belt drive and motor for up to .5" w.c. external static pressure - sizes 150-400
  • Totally enclosed blower motor - sizes 150-400
  • Belt and blower guards

Accessories - Field Installed

  • Vent cap
  • Thermostat
  • Thermostat guard with locking cover
  • Vertical louvers ~ new design
  • Downturn nozzle (30deg or 60deg deflection, with and without vertical louvers) ~ new design
  • Gas conversion kits (natural and propane)
  • High altitude kits (above 6,000 ft to 9,000 ft)
  • Master/slave controls for zoning up to six units
  • Duct flange
  • Polytube adapters
  • Blower and belt guards
  • Hanger kits for 1" pipe
  • Stepdown transformer for 230 or 460 voltage - sizes 30-125
  • Manual shutoff valves

Brochures
4 Files

Brochures


English
Unit Heater Marketing Catalog
Unit Heater Marketing Catalog
Download File
1.3 MB
Comp Edge: The V3 Series heritage
Competitive Edge: The V3 Series have more innovations and technological advances because they are produced by the Number One manufacutrer in the world
Download File
456.6 kB
Comp Edge: With over 70 years of production, Reznor Unit Heaters are the proven leader in the industry
Comp Edge: With over 70 years of production, Reznor Unit Heaters are the proven leader in the industry
Download File
87.4 kB
General Product Brochure
Overview brochure covering the Reznor product line.
Download File
1.6 MB

Technical Data
2 Files

Technical Data


English
Catalog - Unit Heater
Unit heater catalog
Download File
4.5 MB
Submittal - Options - Unit Heater
Options available for gas fired unit heaters
Download File
1.0 MB

Installation/Parts/Service
21 Files

Installation/Parts/Service


English
Unit Installation Manual - UDBP & UDBS
Installation manual for Models UDBP & UDBS
Download File
1.6 MB
Parts Manuals - V3 Unit Heaters
Parts manual for Models UDAP, UDAS, UDBP, & UDBS
Download File
2.6 MB
Option - Installation - Power Venting - UDAP & UDBP
Instructions for power venting Models UDAP & UDBP
Download File
809.5 kB
Conversion Info - Gas Conversion - V3 Series Unit Heaters
Gas conversion kit and instructions for Models UDAP, UDAS, UDBP, & UDBS
Download File
505.0 kB
Option - Installation - Duct Flange Assembly - Unit Heater Blower
Instructions for installing a duct flange on blower models B, UDBP, & UDBS
Download File
318.8 kB
Option - Installation - Hanger Kit Installation - Unit Heaters
Instructions for installing an optional hanger kit
Download File
401.1 kB
Option - Installation - Thermostat Bracket (Unit Mounted) Assembly
Instructions for installing a unit mounted thermostat bracket
Download File
304.1 kB
Option - Installation - Downturn Nozzles - V3
Assembly instructions for downturn nozzles for Models UDAP, UDAS, UDBP, UDBS, & UEAS
Download File
304.7 kB
Option - Installation - Polytube Adapter Instructions for Models UDBP-UDBS
Assembly instructions for polytube adapter kit for Models UDBP & UDBS
Download File
501.3 kB
Option - Installation - Vertical Louvers - V3 Series
Assembly instructions for vertical louvers for Models UDAP, UDAS, UDBP, & UDBS
Download File
202.6 kB
Option - Installation - Stepdown Transformer - V3 Series
Instructions for installing a stepdown transformer for Models UDAP & UDAS, all sizes - and Models UDBP & UDBS, in sizes 30 through 125
Download File
423.1 kB
Option - Installation - Blower Guard - Unit Heaters
Instructions for installing a blower guard
Download File
84.4 kB
Option - Installation - Multiple Heater Control Installation
Installation instructions for multiple heater control system
Download File
491.0 kB
Conversion Info - High Altitude Kit - V3 Series
High altitude installation instructions for Models UDAP, UDAS, UDBP, & UDBS
Download File
572.9 kB
Option - Installation - Thermostat Option
Instructions for installing thermostat for Models UDAP, UDAS, UDBP,  UDBS, & LDAP
Download File
168.5 kB
Option - Installation - Replacement Orifice - V3
Replacment orifice for replacement heat exchanger on Models UDAP, UDAS, UDBP, & UDBS in size 250 and using natural gas (NOTE: applies to units built before January 2007)
Download File
322.0 kB
Parts Manuals - Functional Replacement Fan/Blower Controls and Limit Controls
 Parts manual for functional replacement fan/blower controls and limit controls
Download File
322.8 kB
Parts Manuals - Replacement Ignition System and Gas Valves
Replacement ignition system and gas valves by serial number code and Maxitrol system components by serial number suffix
Download File
964.6 kB
Field Service - Gasket Kit for Heat Exchanger - V3
Gasket kit for replacement heat exchanger for Models UDAP, UDAS, UDBP, & UDBS
Download File
1,014.1 kB
Conversion Info - Gas Conversion - Unit Heaters
Gas conversion kit instructions for Models UDAP, UDAS, UDBP, and UDBS Unit Heaters
Download File
732.7 kB
Field Service - Replacement of Discontinued Relays
Installation for kits designed to replace relays no longer available from suppliers. Applies to all Reznor units using obsolete relays.
Download File
340.4 kB

Other Files
1 File

Other Files


English
Warranty Statement
Reznor equipment limited warranty statement
Download File
175.7 kB